As most of you probably know, Barbie has been itching to do a redesign of a kitchen since she was probably 5 years old and started cooking. Well, her wish is finally coming true, albeit very expensively (except the cabinets…thanks Danny!). So, we have now been relegated to dining out for the next 6 weeks as construction begins. Unfortunately, I was hoping to take some before and after pictures, but I forgot the before pictures, so now you just get the during and after pictures. If you want to get a feel of the kitchen beforehand, you can watch the latest Kyle walking video as he basically shows you the kitchen and breakfast area, which are now being combined into one. Also, I have decided to try out Google’s photo album as our current one is giving me some issues. Therefore, let me know what you think of it.
Below you will find pictures starting with the completion of Day 3 of work (2/27/2008), along with video of the kitchen and me narrating what has happened that day. I’m not a construction guy, so I don’t have all the fancy lingo down, but you will get the drift. As sort of legend, the photos are labeled as to the completion day. So, photos that say “Day 3″ are photos taken after the completion of Day 3. The videos are labeled accordingly as the completion of that day of work. Enjoy.
![]() |
| Kitchen Redesign |
p.s. All photos and videos thus far have been from my phone…so not the best, but simple and easy to use.
Day 3 (2/7/2008) [1:07m]: Play Now | Play in Popup | Download
Day 4 (2/8/2008) [2:25m]: Play Now | Play in Popup | Download
Day 5 (2/9/2008) [2:05m]: Play Now | Play in Popup | Download
Day 6 (2/10/2008) [1:55m]: Play Now | Play in Popup | Download
“ Let us all bask in televisions warm glowing warming glow.